Click here to view our Floater projects
Floater Design Experience
TLP
Spar
FPSO/FSO
Drilling Semi-Submersible
FLNG
Floater Design
Floater Engineering Capabilities
- Global Sizing
- principal dimensions sizing
- weight estimate
- preliminary stability
- preliminary mooring
- preliminary motion
- preliminary cost estimate
- principal dimension optimization
- Global Performance
- advanced hydrodynamic analysis
- global motion
- air gap analysis
- Mooring
- TLP tendons
- tendon sizing
- extreme strength
- fatigue (wave, VIV, VIM, intallation)
- ECA (Engineering Critical Assessment)
- Spread mooring
- chain-wire-chain
- polyester
- Single point mooring
- turret
- CALM buoy
- soft yoke
- Shallow water mooring
- TAD (Tender Assisted Drilling)
- Side-by-Side
- TLP tendons
- Riser
- TTR, SCR, Flexible, Hybrid Riser Tower, Flexible Hose
- Wall Thickness Sizing
- Interference analysis
- Extreme strength analysis
- Fatigue analysis (wave, VIV, VIM)
- Structural
- Hull and topside structure
- Structural arrangement
- Scantling sizing
- Global strength and buckling analysis
- Global fatigue analysis
- Local detail strength and buckling analysis
- Local detail fatigue analysis
- Appurtenances, secondary, and miscellaneous steel design
- Drafting
- Floater Pre-Services
- Load-out analysis and design
- load-out marine analysis and design
- transport barge selection
- load-out ballasting plan
- barge global strength verification
- load-out structure analysis and design
- skid beam analysis and design
- barge strength verification
- load-out marine analysis and design
- Transportation analysis and design
- wet-tow and dry-tow
- marine transport analysis and design
- transport stability analysis
- wet-tow drag force calculation and tug selection
- transport barge global strength verification
- tow structure analysis and design
- cradle, sea-fastening, and tie-down design
- transport barge strength verification
- floater float-on/float-off analysis and design
- float-on/float-off configuration design
- detailed float-on/float-off procedure development
- float-on/float-off marine analysis
- float-on/float-off appurtenances design
- Mooring system installation design and analysis
- anchor installation
- mooring line hookup
- Riser installation design and analysis
- J-Lay, S-Lay, Reel-Lay
- Installation procedure
- Hull installation design and procedure development
- temporary mooring
- mooring hookup
- riser installation
- Load-out analysis and design