OffshoreTech has been working on a project for client Valkor LLC, for the engineering and design of an in-field flowline and riser installation. The flowline connects a subsea wellhead with a platform 100 meters away from the well. The riser is inside an I-tube for protection, which itself is clamped onto the jacket leg.
The scope of work includes design of the I-tube, riser, and in-field flowline, as well as installation engineering, procurement support, and onsite-installation support. The pipeline is to be installed offshore Ecuador in November, 2014 in a water depth of 40 meters.