Assisted by OTL, the installation of the temporary offshore pipeline by Valkor LLC has been successfully completed offshore Peru. The flowline connects a subsea wellhead with a platform 100 meters away from the well. The riser is inside an I-tube for protection, which itself is clamped onto the jacket leg. OTL has been responsible for all design engineering scope, and assisted with the procurement, fabrication, and offshore installation.