OTL received a purchase order from Larsen and Toubro Hydrocarbon Engineering (LTHE) to perform topside and jacket structural design optimization over existing FEED design to achieve steel saving, and much more importantly to reduce the jacket lifting weight in order to employ a smaller crane vessel for the installation of the jacket. The platform is located in Arabian Sea of Middle East.