OTL has received a letter from the client, a major EPCI contractor, confirming the satisfactory completion of the basic design of a couple platforms, including topside decks and jackets, re-configured for the contractor’s preferred fabrication, transportation, and installation methods. The work is extensive, and the platforms were successfully re-configurated, modified and optimized to suit the client’s new pre-services methods and resources.