Cape Wind Wind Farm Transformer Platform Jacket

Client: Cape Wind

Date of Completion: September 2011

SOW and Facts

  • Detailed engineering
  • Jacket pre-services
  • Topside floatover installation analysis and design
  • Determined that topside will be installed by twin barge floatover method
  • First offshore wind farm in the United States
  • Performed complete design, but project was awarded to another company

Location: Massachusetts