Client: Cape Wind
Date of Completion: September 2011
SOW and Facts:
- Detailed engineering
- Jacket pre-services
- Topside floatover installation analysis and design
- Determined that topside will be installed by twin barge floatover method
- First offshore wind farm in the United States
- Performed complete design, but project was awarded to another company
Location: Massachusetts