MRJN GOSP-4 Production Platform Optimization Project

88.jpg

Client: Confidential

Date of Started: 11/25/2018

Location: Marjan Field, Arabian Gulf, water depth of 50.6 m.

Topside Weight: Maximum 34428 MT (including structure and future equipment loads)

SOW: Based on the provided structural drawings, design basis, soil report, metocean data, topside WCR, SACS models, and available installation vessels, OTL performed following optimization design and analyses:

  • Optimize jacket configuration design

  • Design buoyant mudmat boxes to provide additional buoyancy

  • Jacket inplace analysis with DAFs

  • Jacket pushover analysis

  • Jacket lifting analysis

  • Jacket mating analysis

  • Propose the jacket installation methodology