Client: Frontera Energy, T-REX Engineering and Construction
Date of Completion: 2017
Location: Houma, LA, USA to Tumbes Peru
SOW and Facts: Delfin Sur platform transportation and installation. ZH30 was used for installation. The scope of work includes:
· Transportation of jacket, topsides, piles and other ship-loose items from fabrication yards to installation site offshore Peru
· Lifting, upending and lowering jacket
· Pile driving
· Boat landing installation
· Topsides installation