Client: GEDI (Guangdong Electric Power Design Institue CO. LTD.)
Date of Completion: 2018
Location: Yangjiang, Guangdong Province
SOW and Facts: Offshore wind turbine foundation design . The scope of work includes but not limited to:
· Wind turbine foundation global design and planning
· Wind turbine foundation orientation arrangement and loads
· 3-pile foundation scheme
· 4-pile foundation scheme
· Foundation ultimate strength analysis
· Foundation fatigue analysis
· Foundation buckling analysis