• Welcome
    • Our Company at a Glance
    • Client Portfolio
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
Menu

OffshoreTech, LLC

Engineering Offshore Solutions
  • Welcome
  • About Us
    • Our Company at a Glance
    • Client Portfolio
  • Services
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
  • News
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011

Aasta Hansteen Spar Transportation Detailed Design

March 02, 2017

Client: Technip USA 

Date of Completion: May 2014

Location: North Sea, Norwegian waters

SOW and Facts: OTL performed pre-service design for the world’s largest Spar, covering the engineering of float-out, float-on, transportation and float-off operations. The scope of work includes the design of grillage structures, buoyancy tanks, sea-fastening structures, and transportation analysis of the heavy lifting vessel (HLV, Dockwise Vanguard), Spar Hull, grillage/buoyancy tanks, and sea-fastening structures. The analysis includes hydrodynamic analysis, design wave analysis (based on hogging/sagging moment, shear force and grillage support reactions), and structural analysis (strength, buckling and fatigue), which involves material (wood) and geometry (contact/separation) non-linearity. 

  • Structural design
  • Marine system design
  • Sea-fastening design
  • Outfitting
← CX-15 Field Buoyant TowerSany Dry tree semi platform preliminary design →
Back to Top