Client: Confidential
SOW and Facts:
· Participated in detailed structural engineering of the hull
· Participated in the Pre-Services analysis and design of the hull
· Participated in the topside deck floatover installation
· Determined that the topside needed to be installed via "Forklift" floatover method, combining single barge and twin barge methodology under difficult swell conditions
Location: Offshore Peru