Client: Confidential
Date of Completion: September 2011
SOW and Facts: Performed detailed engineering, jacket Pre-Services, and topside floatover installation analysis and design. Determined that the topside will be installed by twin barge floatover method. This will be the first offshore wind farm in the United States.
*Although the contract was awarded to another contractor, OTL submitted the full scope of work summarized above.
Location: Massachusetts, United States of America