• Welcome
    • Our Company at a Glance
    • Client Portfolio
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
Menu

OffshoreTech, LLC

Engineering Offshore Solutions
  • Welcome
  • About Us
    • Our Company at a Glance
    • Client Portfolio
  • Services
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
  • News
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011

Twin Barge Floatover for Gravity Based Structure

April 07, 2014

Client: Confidential

SOW and Facts: OTL determined that the twin barge floatover will be the best way installation method for this project, which is planned to be the heaviest concrete based structure in the world. 

Location: Offshore Canada

← Verification of CA Litoral A FloatoverFloatover of First Offshore Wind Farm in USA →
Back to Top