OTL is proud to be involved in this milestone project for the Mexican offshore industry- the first successful floatover installation achieved in the Gulf of Mexico.
OTL was contracted by client PEMEX to perform a verification of the floatover and installation design and operation, including a review of the design and operational documents. A team of OTL lead representatives visited the Dragados yard for an on-site floatover readiness inspection, and OTL's Chief Naval Architect Dr. Alex Ran went offshore to witness the floatover, and to provide technical support during the installation process.
The SOW includes:
- On-site physical verification by experts
- Loadout manual review report
- Transportation review report
- Floatover installation review report