Client: ZPMC Shipping
Date of Completion: April 2014
SOW and Facts: OTL performed hydrostatic analysis to justify whether the intact and damage stability of the Zhenhua 20 satisfy the ABS requirements.
Weight: Displacement 68,322.9 tons
Dimensions: Lpp 236 meters; B 41.6 meters; Ds 8.5 meters